Odp: James Webb Space Telescope (JWST)
« Odpowiedź #300 dnia: Maj 05, 2018, 21:29 »
Okazało się , że w czasie testów w Northrop Grumman facility odpadły śrubki i podkładki , ale niezagrażające instrumentom. Jest to niepokojące w przypadku tak drogiego projektu , gdzie powinno się przyjmować najwyższe standardy.

JWST suffers new problem during spacecraft testing
by Jeff Foust — May 3, 2018

(...) In a presentation at a meeting of the National Academies’ Space Studies Board here May 3, Greg Robinson, the JWST program director at NASA Headquarters, said some “screws and washers” appear to have come off the spacecraft during recent environmental testing at a Northrop Grumman facility in Southern California.

Technicians found the items after the spacecraft element of JWST, which includes the bus and sunshield but not its optics and instruments, was moved last weekend from one chamber for acoustics tests to another to prepare for vibration testing. (...)

http://spacenews.com/jwst-suffers-new-problem-during-spacecraft-testing/

Offline Orionid

  • Weteran
  • *****
  • Wiadomości: 24420
  • Very easy - Harrison Schmitt
Odp: James Webb Space Telescope (JWST)
« Odpowiedź #301 dnia: Maj 08, 2018, 08:31 »
Nowe problemy techniczne JWST
BY KRZYSZTOF KANAWKA ON 8 MAJA 2018

(...) Od zeszłego roku JWST wykonał serię testów, w tym krytyczny test w komorze termiczno-próżniowej. Seria zakończyła się na początku 2018 roku.Następnie rozpoczęte zostały testy środowiskowe, w tym tych, które symulują zachowanie się teleskopu podczas startu. Podczas jednego z takich testów doszło do poluzowania i odpadnięcia kilku śrub i podkładek. Z dostępnych informacji wynika, że te elementy odpadły od głównej struktury i osłony teleskopu, ale nie od układu optycznego.

Firma Northrop Grumman, w zakładach której znajduje się JWST, uważa, że problemy zostaną niebawem rozwiązane.(...)

https://kosmonauta.net/2018/05/nowe-problemy-techniczne-jwst/
https://spaceflightnow.com/2018/05/08/jwst-beset-by-another-problem-as-northrop-grumman-revamps-training/
« Ostatnia zmiana: Maj 09, 2018, 07:37 wysłana przez Orionid »

Offline kanarkusmaximus

  • Administrator
  • *****
  • Wiadomości: 23210
  • Ja z tym nie mam nic wspólnego!
    • Kosmonauta.net
Odp: James Webb Space Telescope (JWST)
« Odpowiedź #302 dnia: Maj 08, 2018, 15:15 »
Pewnie jeszcze kilka problemów znajdą, zanim będzie gotowy do startu...

Offline artpoz

  • Weteran
  • *****
  • Wiadomości: 3761
Odp: James Webb Space Telescope (JWST)
« Odpowiedź #303 dnia: Czerwiec 27, 2018, 20:09 »
Administrator NASA ogłosił datę startu na 30 marca 2021 roku.

Polskie Forum Astronautyczne

Odp: James Webb Space Telescope (JWST)
« Odpowiedź #303 dnia: Czerwiec 27, 2018, 20:09 »

Offline ekoplaneta

  • Weteran
  • *****
  • Wiadomości: 8589
Odp: James Webb Space Telescope (JWST)
« Odpowiedź #304 dnia: Czerwiec 27, 2018, 21:05 »
Szkoda ze nie na 2100 rok  :P

Offline Orionid

  • Weteran
  • *****
  • Wiadomości: 24420
  • Very easy - Harrison Schmitt
Odp: James Webb Space Telescope (JWST)
« Odpowiedź #305 dnia: Czerwiec 27, 2018, 21:22 »
More delay, cost for NASA's next-generation space telescope
June 27, 2018 by Marcia Dunn

NASA has delayed the launch of its next-generation space telescope—again.

NASA announced Wednesday that the James Webb Space Telescope will now fly no earlier than 2021. The delay means the observatory's overall cost is now expected to reach nearly $10 billion.

Officials blame worker error for at least part of the escalating costs and delays, dating back a decade. Despite the latest trouble, an independent review board urges that the project continue.

Just last month, NASA said fasteners came off the telescope during a vibration test conducted by its primary contractor, Northrop Grumman.

NASA considers Webb its highest science priority and a successor to the Hubble Space Telescope, orbiting since 1990.

In March, NASA announced that it was delaying launch until 2020.
https://phys.org/news/2018-06-nasa-next-generation-space-telescope.html#jCp

JWST suffers another launch delay, breaches cost cap
by Jeff Foust — June 27, 2018

RENTON, Wash. — NASA announced yet another launch delay for the James Webb Space Telescope June 27, pushing the flagship observatory’s launch to no earlier than late March 2021 while breaking a cost cap set by Congress.

NASA said it was now aiming for a launch of the telescope on March 30, 2021, nearly a year later than the May 2020 date that the agency announced three months earlier. That date came after a delay announced last September that moved the mission’s launch from October 2018 to the spring of 2019.

NASA also announced a new development cost estimate of $8.8 billion, which is 10 percent above the $8 billion cost cap established by Congress during a “re-plan” of the mission several years ago. The overall lifecycle cost of the mission, which includes operations after launch for at least five years, is $9.66 billion.

The new development cost breaches the cost cap, which will require Congress to formally reauthorize the mission. NASA Associate Administrator Steve Jurczyk said in a media teleconference that the agency had filed a final breach report with Congress earlier this week because of both the cost and schedule slip and would seek formal reauthorization as part of the fiscal year 2019 appropriations process.

“I think it’s too early to really give an exact sense of what’s happening there,” said Thomas Zurbuchen, NASA associate administrator for science, of congressional reaction to the latest delay. He said his meetings gave the impression that Congress thought the science of JWST was still compelling, but it was premature to further assess the mood on Capitol Hill.

Jurczyk said NASA would need $837 million in additional funding in the “outyears” beyond 2019 compared to the administration’s fiscal year 2019 budget request published in February. The agency is currently working on its fiscal year 2020 proposal, he said, but didn’t indicate how much additional funding he expected NASA would need in 2020 versus later years.

The revised schedule and cost came after the completion of an independent review board that NASA chartered in March. That report offered about 30 recommendations that NASA had accepted to revise the development of JWST and its oversight of work at prime contractor Northrop Grumman.

“It was our assessment that there was still too much optimism built into the schedule,” said the board’s chair, Tom Young, even after the previous slip to May 2020. “We implemented in our view a more realistic assessment as to the time it would take to do these various events.”

Another factor was a problem discovered during an acoustics test at the end of April that caused fasteners in the spacecraft’s sunshield to come loose. That has caused a delay “something in the neighborhood of” six months, he said, to study the problem and retrieve fasteners that came loose inside the spacecraft.

The two-and-a-half-year delay in the JWST has five root causes, Young said, including human errors, embedded problems, lack of experience in new technologies like the sunshield, excessive optimism and systems complexity.

One such example of human error was damage to spacecraft valves when workers used the wrong solvent to clean them, having failed to check with the vendor. Such human errors, he said, accounted for 18 months of schedule delay and $600 million in additional costs.

Maintaining the new schedule requires implementing measures to minimize human errors and to identify other embedded problems with the spacecraft, according to Young. “If the recommendations on human errors and the recommendations on embedded problems are rigorously implemented, which I expect they will be, then I think we have a very high probability” of preventing problems that would have a significant schedule impact, he said.

Young, though, said that there was no reason to reconsider flying the mission at all. “JWST should continue because of the compelling science and because of JWST’s national importance,” he said.
http://spacenews.com/jwst-suffers-another-launch-delay-breaches-cost-cap/

Offline wini

  • Weteran
  • *****
  • Wiadomości: 2608
  • LOXem i ropą! ;)
    • Kosmonauta.net
Odp: James Webb Space Telescope (JWST)
« Odpowiedź #306 dnia: Czerwiec 28, 2018, 00:59 »
To już wiem czemu na kanałach NASA na YT tyle nagle filmików o tym jaki JWST jest super;)

Offline station

  • Sir Astronaut
  • Weteran
  • *****
  • Wiadomości: 3819
Odp: James Webb Space Telescope (JWST)
« Odpowiedź #307 dnia: Czerwiec 28, 2018, 10:57 »
a ja uparcie uważam, że do 2030 jednak zdążą.... ;-)
Rosyjski program kosmiczny to dziś strzelanie rakietami w martwe obiekty na orbicie.

Offline kanarkusmaximus

  • Administrator
  • *****
  • Wiadomości: 23210
  • Ja z tym nie mam nic wspólnego!
    • Kosmonauta.net
Odp: James Webb Space Telescope (JWST)
« Odpowiedź #308 dnia: Czerwiec 28, 2018, 11:03 »
Oj wcale nie muszą - Kongres może powiedzieć "stop". Wcale nie muszą oni dalej finansować JWST. A jeśli na przyszły rok nie znajdą się fundusze, to JWST zostanie pewnie zamrożony.

Offline station

  • Sir Astronaut
  • Weteran
  • *****
  • Wiadomości: 3819
Odp: James Webb Space Telescope (JWST)
« Odpowiedź #309 dnia: Czerwiec 28, 2018, 15:11 »
To była rzecz jasna z mojej strony wyłącznie czysta ironia, tak naprawdę ręce opadają jak się obserwuje te wieczne opóźnienia.... i absolutnie na mojej twarzy nie pojawi się grymas zdziwienia, jesli Konkres faktycznie powie NASA, że ma skończyć się wygłupiać.
Rosyjski program kosmiczny to dziś strzelanie rakietami w martwe obiekty na orbicie.

Offline Orionid

  • Weteran
  • *****
  • Wiadomości: 24420
  • Very easy - Harrison Schmitt
Odp: James Webb Space Telescope (JWST)
« Odpowiedź #310 dnia: Czerwiec 28, 2018, 15:40 »
Oj wcale nie muszą - Kongres może powiedzieć "stop". Wcale nie muszą oni dalej finansować JWST. A jeśli na przyszły rok nie znajdą się fundusze, to JWST zostanie pewnie zamrożony.

Zamrożenie też oznacza koszt.
Bardziej bym się spodziewał cięć budżetowych przy mniej zaawansowanych projektach jak np. WFIRST , którego los i tak jest niepewny.

Skoro zostały nam co najmniej 3 lata do startu , to czy należy się liczyć ze zmianą nosiciela ?
Czy tutaj umowy nie da się zmienić w razie potrzeby ?
Przy dalszych opóźnieniach Ariane 5 może za długo leżakować i się degradować ( po 31 marca 2021 jeszcze 3 starty tej rakiety są zaplanowane).

Offline Orionid

  • Weteran
  • *****
  • Wiadomości: 24420
  • Very easy - Harrison Schmitt
Odp: James Webb Space Telescope (JWST)
« Odpowiedź #311 dnia: Czerwiec 29, 2018, 17:11 »
Start JWST opóźniony do 2021
BY KRZYSZTOF KANAWKA ON 29 CZERWCA 2018

(...) Pod koniec czerwca 2018 amerykańska agencja kosmiczna poinformowała o kolejnym opóźnieniu misji. Aktualnie przewiduje się, że JWST będzie gotowy do startu w marcu 2021 roku. Ponadto, całkowity koszt projektu wzrósł z 8,8 miliarda USD aż do 9,7 miliarda USD, wliczając koszty startu oraz prowadzenia misji przez pięć lat.

Wzrost kosztów misji JWST będzie wymagać “re-autoryzacji” przez amerykański Kongres. NASA ma nadzieję, że formalna zgoda na finalizację prac nad JWST zostanie dołączona do budżetu agencji na rok fiskalny 2019. Jest to najwcześniejsza możliwość zapewnienia kontynuacji projektu. (...)
https://kosmonauta.net/2018/06/start-jwst-opozniony-do-2021/

Ogłoszono nową datę wystrzelenia następcy Kosmicznego Teleskopu Hubble’a
02.07.2018

Pod koniec marca 2021 roku wystartuje Kosmiczny Teleskop Jamesa Webba (JWST), będący następcą Kosmicznego Teleskopu Hubble’a - poinformowały NASA oraz Europejska Agencja Kosmiczna (ESA).

Po ukończeniu oceny postępu prac nad Kosmicznym Teleskopem Jamesa Webba (JWST), dokonanej przez niezależną komisję, NASA podjęła decyzję o kolejnym opóźnieniu terminu wystrzelenia tego teleskopu. Nowa data to 30 marca 2021 r. Poprzednio była mowa o maju 2020 roku, który to termin już i tak oznaczał spóźnienie.

Po tych zmianach całkowity koszt teleskopu od momentu jego powstawania do zakończenia użytkowania jest szacowany na 9,66 miliarda dolarów.

Swoją opóźniającą decyzję NASA podjęła na podstawie wskazań raportu komisji, w którym wykazano, iż problemy techniczne i błędy ludzkie miały spory wpływ na niedotrzymanie harmonogramu przygotowywania teleskopu do lotu w kosmos. Agencja wskazuje, że proces integrowania i testowania poszczególnych elementów teleskopu jest bardziej złożony niż w przypadku zwykłej misji kosmicznej.

Teleskop JWST ma zostać wystrzelony za pomocą europejskiej rakiety Ariane 5 z kosmodromu w Kourou w Gujanie Francuskiej. Projekt prowadzony jest przez NASA we współpracy z Europejską Agencją Kosmiczną (ESA) oraz Kanadyjską Agencją Kosmiczną.

„Teleskop Webba jest kluczowy dla następnej generacji badań naukowych po Teleskopie Hubble’a. Dokona niesamowitych rzeczy, takich których nie byliśmy w stanie osiągnąć do tej pory – spojrzy na inne galaktyki i zobaczy światło z samych początków czasu” - tak znaczenie budowanego instrumentu podkreślił Jim Bridenstine, administrator NASA. Jednocześnie wskazał, że pomimo wielu wyzwań, jednogłośnie zgodzono się na zastosowanie zaleceń komisji. (PAP)
http://naukawpolsce.pap.pl/aktualnosci/news%2C30090%2Cogloszono-nowa-date-wystrzelenia-nastepcy-kosmicznego-teleskopu-hubblea.html

https://www.space24.pl/teleskop-kosmiczny-jamesa-webba-nekany-opoznieniami-seria-trwa
https://www.nasa.gov/press-release/nasa-completes-webb-telescope-review-commits-to-launch-in-early-2021
https://spaceflightnow.com/2018/06/27/webbs-launch-delayed-to-2021-at-a-cost-of-nearly-1-billion/
http://www.collectspace.com/news/news-062718a-webb-space-telescope-delay.html
https://www.nasaspaceflight.com/2018/06/james-webb-slips-year-2021-irb-report/
« Ostatnia zmiana: Lipiec 12, 2018, 07:54 wysłana przez Orionid »

Offline kanarkusmaximus

  • Administrator
  • *****
  • Wiadomości: 23210
  • Ja z tym nie mam nic wspólnego!
    • Kosmonauta.net
Odp: James Webb Space Telescope (JWST)
« Odpowiedź #312 dnia: Lipiec 04, 2018, 17:54 »
Ten obrazek to taka pewne "drwina" z JWST, ale jest możliwe, że będą kolejne opóźnienia z tym teleskopem.

Offline station

  • Sir Astronaut
  • Weteran
  • *****
  • Wiadomości: 3819
Odp: James Webb Space Telescope (JWST)
« Odpowiedź #313 dnia: Lipiec 05, 2018, 11:55 »
Wstyd NASA, wstyd....

JWST i SLS - 2 projekty,  na których NASA ostatecznie się położy i pogrąży. Amen.
Rosyjski program kosmiczny to dziś strzelanie rakietami w martwe obiekty na orbicie.

Offline kanarkusmaximus

  • Administrator
  • *****
  • Wiadomości: 23210
  • Ja z tym nie mam nic wspólnego!
    • Kosmonauta.net
Odp: James Webb Space Telescope (JWST)
« Odpowiedź #314 dnia: Lipiec 05, 2018, 12:16 »
Niestety, uważam, że to są "too big too fail". Z drugiej strony - trudno sobie wyobrazić astronomii bez JWST...

Edit - poprawka :)
« Ostatnia zmiana: Lipiec 05, 2018, 14:23 wysłana przez kanarkusmaximus »

Polskie Forum Astronautyczne

Odp: James Webb Space Telescope (JWST)
« Odpowiedź #314 dnia: Lipiec 05, 2018, 12:16 »