Resetting Artemisby Jeff Foust Monday, November 15, 2021
NASA and SpaceX can move ahead with their HLS contract after a half year of legal delays that NASA said contributed to tis decision to push back the Artemis 3 mission to no earlier than 2025. (credit: SpaceX)There are rarely slow weeks at SpaceX, but last week was certainly was not one of them. The company started the week bringing back a Crew Dragon spacecraft from the International Space Station with four astronauts on board who spent more than six months in space. Less than 48 hours after that Crew Dragon splashed down in the Gulf of Mexico, another Crew Dragon launched on a Falcon 9 from the Kennedy Space Center, delivering a new group of four astronauts to the station within 24 hours of liftoff. Early Saturday, a Falcon 9 lifted off from a nearby pad at Cape Canaveral Space Force Station, placing 53 Starlink satellites in orbit. And, amid all that activity in Florida, the company performed a brief static fire of the six Raptor engines in its first orbital Starship vehicle at Boca Chica, Texas, another step towards a launch some time next year.
https://www.thespacereview.com/article/4284/1