0 użytkowników i 1 Gość przegląda ten wątek.
[CRA2] Shift 1 for the Crater Search Operation (Post-SCI) (CRA2) began on April 24 at 14:30 JST. At 15:54 JST, the GATE 1 check was completed and the spacecraft began the descent at 16:59 JST.
[CRA2] April 25 at 11:50 JST: the spacecraft hovers around the lowest altitude. The altitude here is between 1.6 - 1.7 km. Low altitude observations have begun, and the spacecraft has switched to using the low gain antenna (LGA). These observations should last about an hour.
[CRA2] April 25 at 13:14 JST. The spacecraft initiated a rising ΔV (thruster injection) as planned. The start of the ascent at the planned speed (about 30cm/s) has been confirmed.