Piękny widok
WDR zacznie się 18 a skończy 20 czerwca.
NASA says there are three issues now under evaluation.• A “small grass fire” near the hydrogen flare stack at pad 39B• A possible hydrogen leak in a quick disconnect on the SLS core stage• A pressure limit was exceeded up an upper stage skid
NASA’s Artemis launch team is now discussing resuming the countdown rehearsal and running the clock to T-minus 33 seconds, despite the hydrogen leak in a bleed line in tail service mast umbilical near the bottom of the rocket.
UPDATE: All four @NASA_SLS propellant tanks are now fully fueled and in replenish.