A Bridge from Skylab to Station/Shuttle: Interim Space Station Program (1971) (2)
The AM would have undergone little modification from its first flight as part of Skylab to its last as part of ISS-D. Image credit: NASAThe first three-man ISS-B crew would arrive for a 90-day stint beginning in July 1978, one-and-a-half years after ISS-A's last crew returned to Earth. A second three-man crew would reach the station a month later. The resulting six-man crew would work together for 60 days, then the first three-man crew would return to Earth. A third three-man crew would arrive almost immediately to replace them. Thirty days later, the second ISS-B crew would return to Earth and a fourth crew would replace them. The seventh three-man ISS-B crew would return to Earth in July 1979 and not be replaced, and the eighth and last three-man crew would splash down a month later, about 390 days after ISS-B reached LEO.
ISS-B's main mission would be to perform experimental Earth surveys, which the OART team placed into five categories. These were: agriculture/forestry/geography; geology/mineralogy; hydrology/water resources; oceanography; and meteorology. The station would revolve around the Earth in an orbit inclined 50° relative to the equator, so that it would pass over the "most populace [sic] and agriculturally productive areas of the Earth."
ISS-B astronauts would spend 90 man-hours per week testing, calibrating, and modifying a $40-million, 4700-pound suite of 19 experiment sensors covering the spectrum from ultraviolet through visible light to infrared and microwave. They would also continue biotechnology experiments; for example, the OART team allotted 70 man-hours per week to continuation of the IMBLMS program begun on board ISS-A.
ISS-B solar arrays and batteries would produce between seven and 15 kilowatts of continuous electricity for experiments and station operations. As with ISS-A, the OART engineers did not specify ISS-B's solar array configuration, though they implied that it would have a collecting area larger than the ISS-A configuration.
The MDA flown as part of Skylab was more more cluttered than it appears in this NASA cutaway. Skylab crews did not feel comfortable within the MDA because it lacked an obvious "up-down" orientation; no doubt the ISS MDAs would be modified to take this into account. EREP = Earth Resources Experiment Package. ATM = Apollo Telescope Mount
ISS-C, scheduled for launch in January 1981, and ISS-D, scheduled for launch on NASA's last Saturn V rocket in July 1983, would have many similarities. Each would have a crew complement of nine, making NASA's reliance on the three-man ISS CSM for crew rotation and resupply somewhat problematic. Surprisingly, though the OART engineers acknowledged that, based on their own NASA flight schedule, the reusable Space Shuttle would begin flights in late 1981, they elected (for the sake of "simplicity") not to use it for ISS-C and ISS-D crew rotation and resupply.
ISS CSM launches in January, February, and March 1981 would boost ISS-C's population to nine. Only a month after its third crew arrived, its first crew would complete its 90-day stint on board the station and would return to Earth. NASA would immediately launch a fourth crew to replace them.
ISS-C and ISS-D would each receive 12 three-man crews. Each station would support nine men for 360 of the 420 days it was occupied. Flights to ISS-C and ISS-D would bring to 36 the total number of ISS CSMs and SRM-S-IVB boosters required for the program.
ISS-C astronauts would "evaluate in terms of direct Earth economic benefits the use of the space environment for materials processing and manufacture." Taking advantage of weightlessness and nearly pure vacuum, the astronauts would devote 95 man-hours per week to manufacturing large crystals, exotic composite materials, and biological compounds impossible (or at least very difficult) to create under terrestrial conditions. Manufactured materials and compounds would splash down with returning astronauts as "down" cargo in the ISS-C CMs.
The Saturn V S-IC second stage would have served as a counterweight for the ISS-C artificial-gravity experiment. Image credit: NASAISS-C would also see a 45-day artificial-gravity experiment that would preempt the space exploitation experiments. The OART engineers provided few details of the experiment, though they did explain that the spent S-II second stage of the Saturn V that launched ISS-C into orbit would serve as an artificial-gravity counterweight. Probably cables would have linked the interim station and the spent stage; as the cables were slowly reeled out, thrusters on ISS-C would have fired to spin the assemblage end-over-end and keep the cables under tension. As the cables reached maximum extension, thrusters would carefully trim the spin rate to ensure the desired acceleration - which the crew would feel as gravity - on board the ISS-C station.
The ISS-C/ISS-D solar array configuration would be identical to that of ISS-B; technological advancements would, however, enable their power systems to provide no less than 15 kilowatts of continuous electricity. The ISS-C and ISS-D astronauts would also evaluate Isotope Brayton nuclear power units for use on NASA's permanent Space Station.
The Isotope Brayton units would not reach space attached to ISS-C and ISS-D; rather, they would be launched separately, possibly atop Titan rockets. The OART engineers did not describe how they would rendezvous and dock with ISS-C and ISS-D. The five-ton ISS-C Isotope Brayton unit would generate six kilowatts of electricity; the more advanced six-and-a-half-ton ISS-D unit would produce 15 kilowatts, doubling that station's electrical supply.
Biotechnology experiments would continue during the ISS-C and ISS-D missions. The ISS-C biotechnology program would, of course, include assessment of the effects of spin-induced artificial gravity. With their nine-person crews, the third and fourth stations of the ISS program would be more crowded than their predecessors, offering an opportunity for study of complex human interactions aboard spacecraft.
ISS-D would include three free-flying astronomy modules in addition to asatronomy instruments on the station. How the free-flyers would reach LEO was not made clear. The $50-million Cosmic Ray Physics Laboratory would weigh in at a whopping 26,700 pounds. The $125-million, 6195-pound Solar Astronomy Module would include "larger versions" of the solar astronomy instruments in the Skylab ATM. The $130-million, 6000-pound Stellar Astronomy Module would carry a telescope with a three-meter mirror. For comparison, the Hubble Space Telescope primary mirror is 2.4 meters across. Astronauts would regularly collect exposed film from the free-flying modules, though how they would reach them was not explained.
The OART engineers estimated that, by the time the last ISS-D crew returned to Earth, NASA would have accrued the equivalent of more than two years of permanent Space Station biomedical data and operations experience from its four interim stations. This would, they concluded, constitute the ISS Program's chief benefit to U.S. spaceflight; specifically, it would
enable the [permanent] Space Station to start its effective experimental usefulness almost at initial manning. . . [because] most of the human and operational uncertainties of long duration spaceflight would have been removed by. . .results [from the] four earlier interim space station flights. SourcesStudy of an Evolutionary Interim Earth Orbit Program, Memorandum Report MS-1, J. Anderson, L. Alton, R. Arno, J. Deerwester, L. Edsinger, K. Sinclair, W. Tindle, and R. Wood, Advanced Concepts and Missions Division, Office of Advanced Research and Technology, NASA Headquarters, 6 April 1971
"Intelligence Report: Aims and Costs of the Soviet Space Station Program," SR IR 70-1-S, Directorate of Intelligence, Central Intelligence Agency, January 1970
More Information(...)
Source:
A Bridge from Skylab to Station/Shuttle: Interim Space Station Program (1971)